![]() |
June 28, 2005
HPWREN's first 11GHz licensed link was installed between the San Diego Supercomputer Center and Mt. Soledad
As part of a plan to move near-coastal paths to licensed spectrum, HPWREN upgraded the link between the San Diego Supercomputer Center and the Mt. Soledad backbone site from 5.8GHz radios to 11GHz. Two additional planned upgrades include the backbone sites at the San Diego State University and on Lyons Peak.
These changes are part of a process to increase the robustness of the HPWREN backbone, with the main objective being to protect it from interference. While license-exempt radios were the right approach several years ago when HPWREN started, the broad proliferation of those have made it more and more difficult to maintain and extend an operational and predictable environment that critical applications can rely upon. With the increased robustness of the backbone network, individual access lines can be evaluated and architected on a case-by-case basis. An updated topology of the HPWREN network can be obtained at /topo.html.
![]() |